Sakhalin Islands, Russia.
Anchor Industries supplied, on rental, a five legged mooring and positioning system. The system was assembled from high-holding capacity anchors connected to mooring chains and steel wire ropes. The system was supplied to an upstream Oil & Gas provider.
The total 485 tons of equipment included
- 5 x 25 t Stevshark anchors
- 1600 m x 76 mm stud link chain
- 1050 m x 77 mm steel wire rope
- shackles and buoys